| Golden Eagle Development Area |
 |
| Operator: | Nexen |
| Water Depth: | 114 m / 376 ft |
| Region: | Europe - North Sea |
| Country: | UK |
| Last Updated: | Apr 26, 2013 (view update history) |
|
The Golden Eagle development straddles Blocks 21/1N and 20/1S in the UK sector of the North Sea. Nexen Petroleum operates the development.
Discovered in 2007, the Golden Eagle discovery well was drilled to a depth of about 7,500 feet (2,286 meters), encountering 123 feet (37 meters) of net pay. A successful sidetrack well was drilled to appraise the accumulation, confirming Golden Eagle is commercially viable. The operator estimates that the area contains between 150 and 275 million boe of gross recoverable contingent resources.
Hobby
Situated in 361 feet (110 meters) of water in the UK sector of the North Sea is the Hobby discovery, located on Block 20/1N. Nexen serves as the operator of the field, holding a 34% interest. Other partners ...
The Golden Eagle development straddles Blocks 21/1N and 20/1S in the UK sector of the North Sea. Nexen Petroleum operates the development.
Discovered in 2007, the Golden Eagle discovery well was drilled to a depth of about 7,500 feet (2,286 meters), encountering 123 feet (37 meters) of net pay. A successful sidetrack well was drilled to appraise the accumulation, confirming Golden Eagle is commercially viable. The operator estimates that the area contains between 150 and 275 million boe of gross recoverable contingent resources.
Hobby
Situated in 361 feet (110 meters) of water in the UK sector of the North Sea is the Hobby discovery, located on Block 20/1N. Nexen serves as the operator of the field, holding a 34% interest. Other partners on the field include: Edinburgh Oil and Gas Limited holds 5%; Maersk Oil North Sea UK Limited holds 36%; and Petro-Canada UK Limited holds the remaining 25% interest.
Drilled by the Transocean Prospect semisub, the Hobby prospect was discovered in February 2009. The well flowed at an average restricted rate of 5,500 bopd through a 56/64-inch choke. Early analysis indicates high-quality crude oil in good-quality reservoir sands.
The field will be developed along side the Golden Eagle project.
Pink
The Pink field, located on Block 20/1S in 95 meters of water, lies in the UK sector of the North Sea. Nexen operates the field with a 43.21%; PetroCanada with 29.89%; BG with 21.73%; and Dyon with 5.16%.
Pink will be jointly developed with Golden Eagle and Hobby.
Field Development
The operator proposes to develop the Golden Eagle Area, consisting of Golden Eagle, Pink and Hobby, with up to 20 wells, installing two subsea drilling/production centers, one pipeline end manifold, installing infield and export pipelines, and installing a platform complex.
The development will include two subsea drilling/production centers and a jack-up drilling rig over a newly installed wellhead platform that will be bridge-linked to a fixed production/utilities/quarters platform.
Oil and gas will be processed at the platform complex with gas exported to the SAGE export line via the Ettrick pipeline end manifold. Oil will be exported either to the Forties pipeline system via a tie-in at the Buzzard field or to Flotta terminal via a tie-in at the Claymore field.
Production is expected to commence in 2014 with rates peaking between 2016 and 2018. The maximum production rate from the development is expected to flow at 70,000 bopd. The proposed development has an expected life span of 25 years.
|
|
|
Sembcorp Marine Awarded Additional Golden Eagle Contract
Type: Development Activity
Apr. 2013 - Sembcorp Marine's subsidiary, Sembmarine SLP Limited (SLP), was awarded a $10.8 million contract to build the bridge and flare structure for Nexen's Golden Eagle project in the UK North Sea. The 550-ton bridge will span 230 feet and provide access between the production, utilities and quarters platform and the drilling platform. The designed length of the flare boom is 230 feet as well and will weigh in at 225 tons. SLP is also building the Golden Eagle living quarters platform under a separate contract. Both projects are scheduled to be delivered in May 2014.
|
|
|
|
Solitaire Receives DECC Approval
Type: Development Activity
Jan. 2013 - Nexen Petroleum received approval for its Solitaire field development plan from the UK Department of Energy and Climate Change. Solitaire is located in block 14/26a near the Golden Eagle Development Area. Development of the field will consist of an umbilical and production and gas lift flowlines feeding the Goldean Eagle northern manifold from a single production well. Engineering and design work will commence immediately. Field installation expected to start mid-2014 with first oil to follow in 2015. Solitaire is expected to produce eight million barrels of oil during the life of the field.
|
|
|
|
Wood Group Bags Golden Eagle Contract
Type: Development Activity
Jan. 2013 - Wood Group has been selected to perform hook-up and commissioning work at Nexen Petroleum's Golden Eagle Development Area in the UK North Sea. Golden Eagle is being developed using a wellhead platform and a PUQ platform connected by a 230 foot bridge. Production is scheduled to begin in late 2014. Once online, the field is expected to flow at an initial rate of 70,000 boed with a projected life of 18 years.
|
|
|
|
Technip to Supply Subsea Equipment for Golden Eagle Development
Type: Contract Award
Jan. 2012 - Nexen awarded Technip a lump sum contract for the Golden Eagle development located in the UK sector of the North Sea. The contract covers the engineering, procurement, installation and commissioning of two export, one production, one mechanically lined water injection and one gas lift flowlines; one main umbilical and two subsea isolation valve umbilicals; subsea equipments; trenching and backfilling of all flowlines and umbilicals; tie-ins, protection, pre-commissioning and commissioning support. The project is scheduled for completion in the second half of 2014. The development plan for Golden Eagle includes a combined production, utilities and an accommodation platform linked to a separate wellhead platform. Golden Eagle is located on Block 20/1N in 374 feet (114 meters).
|
|
|
|
Nexen to use Ensco Jackup for Golden Eagle Development
Type: Development Activity
Nov. 2011 - Nexen Petroleum has signed a drilling contract for the use of the ENSCO 120 jackup (400'ILC) to develop the Golden Eagle project in the Central North Sea. The rig will drill 10 wells starting in the fourth quarter in 2013 following systems integration testing and mobilization. The operator may extend the term through 11 one-well options. The development plan for Golden Eagle will include a combined production, utilities and an accommodation platform linked to a separate wellhead platform. Detailed design engineering has started, and construction is scheduled to begin late 2011 with production slated for late 2014. Golden Eagle should produce at an average rate of up to 70,000 boepd. Golden Eagle is located on Block 20/1N in 374 feet (114 meters).
|
|
|
|
DECC Gives Nexen Approval to Develop Golden Eagle
Type: Development Activity
Oct. 2011 - The UK Department of Energy and Climate Change (DECC) has granted Nexen Petroleum UK, a subsidiary of Nexen Inc., approval to proceed with the Golden Eagle area development. The development is expected to produce approximately 140 MMbbl of oil equivalent of proved and probable reserves over an 18-year period. The Golden Eagle development includes both the Golden Eagle and Peregrine reservoirs situated in central North Sea blocks 20/1N, 20/1 and 14/26a, about 43 miles (69 kilometers) from Aberdeen. The development plan for Golden Eagle incorporates a combined production, utilities and an accommodation platform linked to a separate wellhead platform. The operator will drill 20 development wells (16 platform-based and four subsea). Plans also include associated in-field and an export pipeline infrastructure. Detailed design engineering started, and construction is scheduled to begin late-2011. Pipeline and subsea installation should begin in early 2013, followed by drilling later that same year. Production is slated for late-2014. Golden Eagle should produce at an average rate of up to 70,000 boe/d. Nexen, as operator, holds a 36.54 percent working interest in the field. The remaining interest is held by Maersk Oil (31.56 percent), Suncor Energy (26.69 percent) and Edinburgh Oil and Gas (5.21 percent).
|
|
|
|
Nexen, Prosafe Team Up for Golden Eagle Development
Type: Contract Award
Sep. 2011 - Nexen granted Prosafe a contract for a 240-day firm period using the Safe Caledonia for accommodation support at the Golden Eagle facility in the UK sector of the North Sea. On-site operations should begin between May and July 2014. In addition, Prosafe granted Nexen one additional 30-day option. The value of the awarded contract is US $74 million. The Golden Eagle development, located on Block 20/1N in 374 feet (114 meters), is slated for production in 2014. Nexen serves as the operator of Golden Eagle with a 31.56 percent interest.
|
|
|
|
Maersk Oil Approves its Share of Costs for Golden Eagle Development
Type: Status Update
Jun. 2011 - Maersk Oil, a partner in the Golden Eagle development, has approved its share of US $1 billion in the field development plan for the Golden Eagle Area in the UK sector of the North Sea. Subject to partner and regulatory approvals, construction of a platform and other infrastructure will begin in November 2011. First oil is expected in 2014 with initial production rates at between 60,000 to 65,000 bopd. Golden Eagle contains up to 140 to 150 MMbbl of oil equivalent, making it one of the largest discoveries in the UK North Sea, stated operator, Nexen.
|
|
|
|
Nexen, CB&I Shake Hands for Golden Eagle Platforms
Type: Facility Construction
May. 2011 - Nexen Petroleum has awarded CB&I a US $150 million contract to do the detailed engineering on two fixed platforms for the Golden Eagle field in the UK sector of the North Sea. The company's scope of work includes detailed engineering design of the topsides of a wellhead platform and a production utilities and quarters platform. CB&I's contract is scheduled for completion by the end of 2012. The company also recently completed the front-end engineering design (FEED) work for the project. Operated by Nexen, the Golden Eagle area consists of two Blocks, 21/1N and 20/1S, in the UK sector of the North Sea.
|
|
|
|
Development Plans for Golden Eagle Nearing Completion
Type: Status Update
May. 2011 - Maersk Oil, a partner on the Golden Eagle field, announced that the consortium expects to complete development plans for the Golden Eagle area by mid-2011. Operated by Nexen, the Golden Eagle area consists of two Blocks, 21/1N and 20/1S, in the UK sector of the North Sea and compromises three reservoirs: Golden Eagle, Hobby and Pink.
|
|
|
|
Penspen to Provide FEED Study for Golden Eagle Development
Type: Contract Award
Oct. 2010 - Nexen Petroleum awarded a contract to Penspen Limited to perform a subsea front-end engineering and design study for the Golden Eagle development. The company will provide an integrated FEED study establishing structural requirements, specifications, and operational functionality and flow assurance for the subsea portion of the Golden Eagle area development. Operated by Nexen, the Golden Eagle area consists of two Blocks, 21/1N and 20/1S, in the UK sector of the North Sea and compromises three reservoirs, Golden Eagle, Hobby and Pink.
|
|
|
|
KCA Deutag to Provide Engineering Services for Golden Eagle Area
Type: Contract Award
Nov. 2009 - The Golden Eagle Area is being analyzed so a drilling facility may be constructed for the area's development. Operated by Nexen, the Golden Eagle Area consists of two Blocks, 21/1N and 20/1S, in the UK sector of the North Sea and compromises three reservoirs, Golden Eagle, Hobby and Pink. RDA received a contract from Nexen for the provision of a drilling facility concept design in order to create a cost effective drilling rig specification.
|
|
|
|
Nexen's Golden Eagle Takes Flight as 'Major Development'
Type: Status Update
Sep. 2009 - Nexen continues its significant growth in the UK North Sea, announcing the discovery of substantial additional resources and the start up of new production. Based on Nexen's assessment of the data acquired to date, including three exploration wells, nine appraisal wells, three drill-stem tests, one injectivity test and extensive core data, the company estimates that the Golden Eagle area contains between 150 and 275 million boe of gross recoverable contingent resources and is becoming a major development project. The Golden Eagle area includes Nexen's 34% operated interest in both the Golden Eagle and Hobby discoveries and its 46% operated interest in the Pink discovery.
|
|
|
|
Nexen Sees Strong Flow at Hobby Discovery
Type: Development Activity
Mar. 2009 - The Hobby discovery well flowed at an average restricted rate of 5,500 bopd through a 56/64-inch choke. Early analysis indicates high-quality crude oil in good-quality reservoir sands. Multiple sidetracks are planned. Hobby was discovered in February 2009 in the UK North Sea on Block 20/1N, west of Golden Eagle. Nexen serves as the operator.
|
|
|
|
Nexen Mulls Future Appraisal & Development Alternatives for Golden Eagle
Type: Status Update
Feb. 2009 - Nexen is currently assessing future appraisal and development alternatives for the growing Golden Eagle area. The company plans to drill multiple sidetracks to determine the extent for the field. Nexen has identified additional prospects in the area and have plans for further exploratory and appraisal drilling this year.
|
|
|
|
Nexen Unlocks Oil at Hobby Near Golden Eagle Find
Type: New Discovery
Feb. 2009 - Nexen has announced an oil discovery at the Hobby exploration well, where Nexen is the operator with a 34% interest. Drilled by the Transocean Prospect semisub, the discovery is located in the UK Central North Sea Block 20/1N approximately 1.5 km west of the recent Golden Eagle discovery.
|
|
|
|
Nexen Evaluating Development Options for Golden Eagle
Type: Status Update
Feb. 2009 - In the first quarter of 2007, the Golden Eagle discovery well was drilled to a depth of approximately 7,500 feet and encountered 123 feet of net pay. A successful sidetrack well was drilled to appraise the accumulation, and Nexen is currently evaluating development options. The current estimate of gross resource for the field is between 20 and 50 mmboe.
|
|
|
|
Nexen Says Pink is Candidate for Co-development with Golden Eagle
Type: Status Update
Feb. 2009 - In the fourth quarter of 2008, Nexen drilled a discovery at Pink that encountered 57 feet of net oil pay. This discovery was followed up with a sidetrack delineation well that encountered 134 feet of net oil pay. These results are encouraging and consistent with pre-drill estimates. Pink is a candidate for co-development with Golden Eagle where Nexen is currently reviewing development options.
|
|
|
Solitaire
|
|
Under Development - Jan 2013 to -
|
|
|
Golden Eagle Complex
|
|
Under Construction - Jun 23, 2011 to -
|
|
|
Hobby
|
|
Under Development - Jun 23, 2011 to -
|
|
Discovery (Appraised) - Nov 2009 to 2010
|
|
Appraisal Drilling - Oct 18, 2009 to Nov 2009
T.O.s Prospect drilled appraisal well 20/01-11Z.
|
|
Discovery (Drilled) - Feb 2009 to Feb 2009
Oil discovery made at well 20/1-8
|
|
Exploratory Drilling - Jan 2009 to Feb 2009
Transocean Prospect semisub drilling 20/1-8
|
|
|
Pink
|
|
Under Development - Jun 23, 2011 to -
|
|
Discovery (Appraised) - Sep 2008 to 2009
Sidetrack delineation encountered 134 feet net oil pay.
|
|
Appraisal Drilling - Jul 2008 to Sep 2008
Borgsten Dolphin drilled appraisal well 20/1-7z
|
|
Exploratory Drilling - Jun 2008 to Jul 2008
Borgsten Dolphin drilled exploratory well 20/1-7. Well encountered 57 feet of net oil pay.
|
|
|
Golden Eagle
|
|
Under Development - Jun 23, 2011 to -
|
|
Discovery (Appraised) - Feb 2007 to Aug 2009
|
|
Appraisal Drilling - Jan 2007 to Feb 2007
Borgsten Dolphin drilled appraisal well 20/1-6z
|
|
Exploratory Drilling - Nov 2006 to Jan 2007
The Borgsten Dolphin drilled exploration well 20/1-6.
|
|
|
|
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market.
The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
|
| UPDATE TYPE |
DATE |
DAYS AGO |
| Facility Updated |
Apr 26, 2013 |
54 |
|
| Activity Added |
Apr 26, 2013 |
54 |
|
| Activity Added |
Jan 24, 2013 |
146 |
|
| Field Added |
Jan 23, 2013 |
147 |
|
| Field Status Added |
Jan 23, 2013 |
147 |
|
| Field Status Updated |
Jan 23, 2013 |
147 |
|
| Field Updated |
Jan 23, 2013 |
147 |
|
| Field Updated |
Jan 17, 2013 |
153 |
|
| Project Description Updated |
Jan 17, 2013 |
153 |
|
| Facility Updated |
Jan 17, 2013 |
153 |
|
| Activity Added |
Jan 17, 2013 |
153 |
|
| Project Description Updated |
Jun 18, 2012 |
366 |
|
| Field Updated |
Jun 18, 2012 |
366 |
|
| Facility Updated |
Jun 18, 2012 |
366 |
|
| Activity Added |
Jan 11, 2012 |
525 |
|
| Field Updated |
Jan 11, 2012 |
525 |
|
| Project Description Updated |
Jan 11, 2012 |
525 |
|
| Field Updated |
Dec 12, 2011 |
555 |
|
| Facility Added |
Nov 14, 2011 |
583 |
|
| Facility Status Added |
Nov 14, 2011 |
583 |
|
| Field Updated |
Nov 14, 2011 |
583 |
|
| Activity Added |
Nov 14, 2011 |
583 |
|
| Field Updated |
Oct 27, 2011 |
601 |
|
| Project Description Updated |
Oct 27, 2011 |
601 |
|
| Activity Added |
Oct 27, 2011 |
601 |
|
| Field Updated |
Sep 14, 2011 |
644 |
|
| Activity Added |
Sep 14, 2011 |
644 |
|
| Field Updated |
Sep 13, 2011 |
645 |
|
| Project Description Updated |
Sep 13, 2011 |
645 |
|
| Field Status Updated |
Sep 13, 2011 |
645 |
|
| Field Status Added |
Sep 13, 2011 |
645 |
|
| Activity Added |
Jun 23, 2011 |
727 |
|
| Field Updated |
Jun 23, 2011 |
727 |
|
| Project Description Updated |
Jun 23, 2011 |
727 |
|
| Field Updated |
May 26, 2011 |
755 |
|
| Activity Added |
May 26, 2011 |
755 |
|
| Project Description Added |
May 12, 2011 |
769 |
|
| Activity Added |
May 11, 2011 |
770 |
|
| Activity Added |
Oct 14, 2010 |
979 |
|
| Field Updated |
Oct 14, 2010 |
979 |
|
| Activity Added |
Nov 25, 2009 |
1302 |
|
| Field Updated |
Nov 25, 2009 |
1302 |
|
| Field Updated |
Sep 03, 2009 |
1385 |
|
| Activity Added |
Sep 03, 2009 |
1385 |
|
| Activity Added |
Feb 23, 2009 |
1577 |
|
| Field Updated |
Feb 23, 2009 |
1577 |
|
| Field Status Added |
Feb 13, 2009 |
1587 |
|
| Field Added |
Feb 13, 2009 |
1587 |
|
| Activity Added |
Feb 12, 2009 |
1588 |
|
Project Update History Search - View all the lastest updates made by the SubseaIQ team.
|
|
| Facility Name |
Golden Eagle Complex |
|
| Duty |
Oil/Gas |
|
| Operator |
Nexen |
|
| Current Status |
Under Construction since 2011 |
|
| Host Type |
Fixed Platform |
|
| Water Depth |
114 m / 376 ft |
|
| Dev.Cost |
n/a |
| |
| Region |
UK |
| |
| Location |
20/1N |
| Field Name |
Hobby |
|
| Discovery Date |
Feb 2009 |
|
| Block |
20/1N |
|
| Reserve Type |
Oil |
|
| Current Status |
Under Development |
|
| Production Start |
|
|
| Water Depth |
110 m / 363 ft |
| Field Name |
Golden Eagle |
|
| Discovery Date |
Jan 2007 |
|
| Block |
20/1N |
|
| Reserve Type |
Oil |
|
| Current Status |
Under Development |
|
| Production Start |
|
|
| Water Depth |
114 m / 376 ft |
| Field Name |
Pink |
|
| Discovery Date |
Jul 2008 |
|
| Block |
20/1S |
|
| Reserve Type |
Oil |
|
| Current Status |
Under Development |
|
| Production Start |
|
|
| Water Depth |
95 m / 314 ft |
| Field Name |
Solitaire |
|
| Discovery Date |
|
|
| Block |
14/26a |
|
| Reserve Type |
Oil/Gas |
|
| Current Status |
Under Development |
|
| Production Start |
|
|
| Water Depth |
114 m / 376 ft |
|