Project Description
The Timon prospect is situated in Blocks 211/11b and 211/16b in the UK sector of the North Sea. MPX North Sea operates the blocks with a 15 percent stake; Valiant holds 10 percent; Agora holds 25 percent; Wintershall holds 35 percent; and Sorgenia holds 15 percent.

Timon is considered an Upper Jurassic channelized sand play similar to the Cladhan and Tybalt discoveries and anticipated to spud during the second quarter 2012 using the WilHunter (UDW semisub).
The Timon prospect is situated in Blocks 211/11b and 211/16b in the UK sector of the North Sea. MPX North Sea operates the blocks with a 15 percent stake; Valiant holds 10 percent; Agora holds 25 percent; Wintershall holds 35 percent; and Sorgenia holds 15 percent.

Timon is considered an Upper Jurassic channelized sand play similar to the Cladhan and Tybalt discoveries and anticipated to spud during the second quarter 2012 using the WilHunter (UDW semisub).
Activities
Status Updates
Timon Comes Up Dry
Type: Drilling Operations

Mar. 2013 - Drilling operations on exploration well 211/11b-7 are being wrapped up in order to plug and abandone the well. The well, being drilled on the Timon prospect, has been declared a dry hole. Upper Jurassic sands were found to be poorly developed in the target location.

Transocean John Shaw to Re-Enter Timon
Type: Drilling Operations

Jan. 2013 - Valiant Petroleum announced the arrival of the Transocean John Shaw (mid-water semisub) at the Timon prospect to re-enter exploration well 211/11b-7. The well was spudded by another rig in September 2012 but had to be suspended do to excessive technical downtime. It is thought that 40 days will be required to reach total depth. Timon is an Upper Jurassic play with gross best estimate prospective resources of 30 million barrels of oil equivalent.

MPX Terminates Rig Contract
Type: Status Update

Jun. 2012 - MPX Energy and partners have terminated the drilling contract with Awilco Drilling as a consequence of technical downtime. The semisub was conducting exploratory drilling at the Timon exploration well in the UK sector of the North Sea. As previously reported, the well has been suspended for reentry and the license partners are currently investigating alternative rig options to complete drilling of the Timon prospect.

MPX Halts Timon Drilling Ops
Type: Drilling Operations

May. 2012 - The WilHunter (UDW semisub), which is drilling the Timon exploration well in the UK sector of the North Sea, has incurred technical downtime due to equipment failure. Therefore, operations at the Timon well have been temporarily suspended and the current estimated length of downtime is roughly 18 days. A further update will be released once the semisub is able to recommence normal operations, which is expected to be in early June 2012.

MPX North Sea Spins Bit at Timon Prospect
Type: Drilling Operations

May. 2012 - Valiant Petroleum announced that the WilHunter (UDW semisub) has arrived on location to drill the Timon prospect, located in the UK sector of the North Sea. The well is anticipated to spud within the next few days and take around 40 days to complete. Timon is an Upper Jurassic channelized sand play similar to the Cladhan and Tybalt discoveries also located in the UK Northern North Sea. Gross best estimate prospective resources are estimated by Valiant to be 30 million barrels of oil equivalent.

Valiant Obtains Interest in Timon Prospect
Type: Status Update

Jan. 2012 - Valiant has farmed into Blocks 211/11b and 211/16b in the UK sector of the North Sea acquiring a 10 percent stake from Agora Oil & Gas. The blocks contain the Timon prospect, an Upper Jurassic stratigraphic trap. The consortium plans to spud the prospect in 1Q 2012 using the WilHunter (mid-water semisub). Valiant estimates prospective resources to total 30 mmboe.

Timon
Non-Commercial - Mar 2013 to -

Exploratory Drilling - Jan 2013 to Feb 2013

Transocean John Shaw arrived on location to re-enter well.

Suspended - May 24, 2012 to Jan 2013

The WilHunter (UDW semisub), which is drilling the Timon exploration well in the UK sector of the North Sea, has incurred technical downtime due to equipment failure. Therefore, operations on the Timon well have been temporarily suspended and the current estimated length of downtime is roughly 18 days.

Exploratory Drilling - May 01, 2012 to May 23, 2012

Bright Spot - 2011 to Apr 30, 2012

Update History
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market. The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
UPDATE TYPE DATE DAYS AGO
Field Updated Mar 04, 2013 80
Field Status Updated Mar 04, 2013 80
Field Status Added Mar 04, 2013 80
Activity Added Mar 01, 2013 83
Field Updated Jan 25, 2013 118
Field Status Updated Jan 25, 2013 118
Field Status Added Jan 25, 2013 118
Activity Added Jan 25, 2013 118
Field Updated Jun 06, 2012 351
Activity Added Jun 06, 2012 351
Field Updated May 24, 2012 364
Field Status Updated May 24, 2012 364
Field Status Added May 24, 2012 364
Activity Added May 24, 2012 364
Field Status Updated May 04, 2012 384
Field Updated May 04, 2012 384
Project Description Updated May 04, 2012 384
Activity Added May 04, 2012 384
Field Status Updated Feb 24, 2012 454
Field Status Added Feb 24, 2012 454
Field Updated Feb 24, 2012 454
Project Description Added Feb 24, 2012 454
Field Added Jan 10, 2012 499
Field Status Added Jan 10, 2012 499
Activity Added Jan 10, 2012 499

    Project Update History Search - View all the lastest updates made by the SubseaIQ team.
 
 
 
Field Name Timon
Discovery Date
Block 211/11b, 211/16b
Reserve Type n/a
Current Status Non-Commercial
Production Start
Water Depth 184 m / 607 ft