Project Description
The Cladhan field is located on Blocks 210/29a and 210/30a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters). TAQA Bratani, holding a 40.1% interest, operates Cladhan; Wintershall holds 33.5%; and Sterling holds 26.4%.

In November 2008, Cladhan's discovery well confirmed the presence of a stratigraphically trapped 110-foot light oil column. To further appraise this find, the operator secured the J W McLean semisub to appraise the southward extension of the area.

Appraisal drilling commenced on the field on Feb. 28, 2011 and ended in May 2011. The objective of the appraisal well was to drill further down dip into the Cladhan structure, to the south east of the original 2008 discovery and subsequent 2010 side-track wells, to attempt ...
The Cladhan field is located on Blocks 210/29a and 210/30a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters). TAQA Bratani, holding a 40.1% interest, operates Cladhan; Wintershall holds 33.5%; and Sterling holds 26.4%.

In November 2008, Cladhan's discovery well confirmed the presence of a stratigraphically trapped 110-foot light oil column. To further appraise this find, the operator secured the J W McLean semisub to appraise the southward extension of the area.

Appraisal drilling commenced on the field on Feb. 28, 2011 and ended in May 2011. The objective of the appraisal well was to drill further down dip into the Cladhan structure, to the south east of the original 2008 discovery and subsequent 2010 side-track wells, to attempt to discover deeper oil in the structure.

Cladhan South

The Cladhan South prospect is located on Blocks 210/29c and 210/30b. Sterling Resources holds 12.5 percent; TAQA holds 12.5 percent; Wintershall holds 25 percent; Valiant Exploration holds 30 percent; and Agora Oil and Gas holds 20 percent.

Cladhan South is an Upper Jurassic channelized sand play immediately to the south of the existing Cladhan discovery with gross prospective resources estimated internally by Valiant to be 13 MMboe. The well was drilled by the Sedco 704 (mid-water semisub).

The well encountered multiple Upper Jurassic sand channels on prognosis, none of which were thought to be hydrocarbon-bearing.

Development

The UK Department of Energy and Climate Change approved the Cladhan field Plan of Development in April 2013. First phase of development will see two production wells and one injection well tied back to the Tern Alpha platform. First oil is expected in 1Q 2015.
Activities
Status Updates
Wintershall to Divest $375 Million in UK North Sea Assets
Type: Acreage Acquisition

Dec. 2013 - In an effort to optimize its portfolio, Wintershall elected to divest its interest in 14 licenses in the UK North Sea to Hungary-based MOL Group. The transaction will see MOL gain non-operated equity in the Broom field (29%), the Catcher (20%), Cladhan (33.5%) and Scolty/Crathes (50%) developments and Wintershall's portion of the infrastructure that comprises the Sullom Voe Terminal and Brent Pipeline Systems. The agreement, which must meet customary regulatory approval, is valued at $375 million and is subject to value adjustments at closing in 1Q 2014. Additionally, the two companies signed a cooperation agreement to pursue exploration and production opportunities in the North Sea and Middle East.

TAQA Awards AMEC Additional Cladhan Work
Type: Development Activity

Sep. 2013 - TAQA awarded an engineering, procurement and construction (EPC) contract to AMEC regarding modifications to the Tern Alpha platform in the UK North Sea. The modifications are necessary to accommodate a new subsea tieback to the Cladhan field in license P1064. Award of the contract follows AMEC’s completion of front end engineering and design (FEED) work for the project. EPC work is to commence immediately and run through December 2014. TAQA expects Cladhan oil production to begin in early 2015 with an initial rate of over 17,000 boepd.

Cladhan Gets UK DECC Nod
Type: Development Activity

Apr. 2013 - The UK Department of Energy and Climate Change (DECC) has approved the plan of development for the Cladhan field, which was submitted in early February. The first phase of will consists of two oil producers and one injection well. Production will be tied back to the TAQA-operated Tern Alpha platform which is positioned almost 11-miles from Cladhan. The field is expected to produce 17,000 boepd with first oil planned for 1Q 2015.

Cladhan FDP Submitted to UK DECC
Type: Development Activity

Mar. 2013 - In early February 2013, the final version of the Cladhan Field Development Plan (FDP) was submitted to the UK Department of Energy and Climate Change (DECC). Approval of the FDP is expected near the end of March 2013. Cladhan lies in Permit 1064 and covers blocks 210/29a and 210/30a. TAQA Bratani operates the license and holds a 40.1 percent interest with partners Sterling Resources and Wintershall holding 26.4 percent and 33.5 percent interest, respectively. The development plan calls for two subsea producers and one subsea water injector. Each well will be tied back to the Tern platform, located 11 miles (18 kilometers) away. First oil is envisioned in late 2014 or early 2015. Subsea trees, wellheads and subsea controls have already been procured and a pipeline commitment was made. The Transocean John Shaw (mid-water semisub) has been contracted to carry out development drilling.

TAQA to Acquire Operatorship of Cladhan
Type: Acreage Acquisition

Apr. 2012 - TAQA Bratani will acquire a 13.5 percent stake in the North Cladhan area from Sterling Resources for an initial consideration of $47 million including an allocation to tax allowances. The initial consideration will be satisfied in three installments: $22.3 million paid upon completion; $4.3 million paid on achievement of certain milestones expected in 2012; and the balance either as a carry of part of Sterling's development expenditure in respect of Cladhan or, subject to satisfaction of certain conditions linked to project approval, in whole or in part (at Sterling's election) in cash up to a maximum payment of $20.4 million. In addition, Sterling could receive a contingent consideration after first production linked to reserves upside up to a maximum additional payment of $10 million if proven plus probable reserves are certified in the range of 30 million barrels to 45 million barrels for 100 percent of the field. TAQA will assume operatorship on or shortly after approval of a final Field Development Plan expected for submission by 3Q 2012. Once this transaction is completed and approved, the new equity positions will be Sterling Resources (26.4 percent), TAQA (40.1 percent) and Wintershall (33.5 percent).

Valiant Fails to Hit Pay in Cladhan South
Type: Drilling Operations

Apr. 2012 - Valiant Petroleum will plug and abandon the Cladhan South exploratory prospect in Block 210/29c in the UK sector of the North Sea. The well encountered multiple Upper Jurassic sand channels on prognosis, none of which were thought to be hydrocarbon-bearing.

Valiant Spuds Cladhan South
Type: Status Update

Mar. 2012 - Valiant Petroleum has commenced drilling at the Cladhan South exploratory prospect, located in Block 210/29c in the UK sector of the North Sea. Cladhan South is an Upper Jurassic channelized sand play immediately to the south of the existing Cladhan discovery with gross prospective resources estimated internally by Valiant to be 13 MMboe. The well is being drilled by the Sedco 704 (mid-water semisub) and is anticipated to take 35 to 40 days to complete.

Taqa Bratani to Commence Drilling Program in North Sea
Type: Status Update

Mar. 2012 - Taqa Bratani is gearing up to commence an exploratory drilling program in the North Sea, which includes exploration wells on the Timone, Contender, Cladhan and Darwin prospects. The company has contracted the Transocean John Shaw (mid-water semisub) for the drilling program. Taqa also has platform-based rigs, and after working on Tern its drilling crew is to move to the North Cormorant field.

TAQA Snags Interest in North Sea Cladhan
Type: Operator Update

Mar. 2012 - TAQA announced the conditional acquisition for a consideration of $54.8 million including an allocation for tax allowances of a 16.6% interest in the North Sea Cladhan oil discovery from Premier Oil plc (Premier), which Premier was expected to own following completion of its proposed acquisition of Encore Oil plc. Since 1 January 2012, Premier has completed the acquisition of Encore, and completion of the Cladhan asset acquisition by TAQA is expected shortly. The blocks are located 18 kilometres southwest of the TAQA-operated Tern platform.

Sterling Contracts Semisub to Drill Cladhan South
Type: Appraisal Operations

Feb. 2012 - Sterling Resources has contracted the Transocean Sedco 704 (mid-water semisub) to drill an exploration well in the South Cladhan area in the UK sector of the North Sea. The rig is due on location in March. Cladhan South is an upper Jurassic channelized sand play immediately to the south of the existing Cladhan discovery. The Cladhan field is located on Blocks 210/29a and 210/30a in a water depth of 1,634 feet (498 meters).

Sterling Resources to Spud Cladhan South in 1Q12
Type: Status Update

Jan. 2012 - Sterling Resources issued a letter of intent to use the Sedco 704 (mid-water semisub) to drill the Cladhan South prospect in the first half of 2012. Cladhan South is an upper Jurassic channelized sand play immediately to the south of the existing Cladhan discovery. The Cladhan field is located on Blocks 210/29a and 210/30a in a water depth of 1,634 feet (498 meters). Serving as operator of the field is Sterling Resources, holding a 39.9% interest; EnCore holds 16.6%; Wintershall holds 33.5%; and Dyas holds the remaining 10%.

Sterling Completes Fourth well on Cladhan Discovery
Type: Appraisal Operations

Jun. 2011 - Sterling Resources has completed drilling a fourth well on the Cladhan discovery in the UK sector of the North Sea. Well 210/30a-4X, drilled by the Transocean Prospect semisub, was designed to further appraise the extent of the Cladhan reservoir. It was drilled in the most southern limit of the northern core area in a potentially separate channel. The objectives of the 210/30a-4X sidetrack well were to core the full reservoir section about .6 mile (1 kilometer) south and approximately 60 feet (18 meters) up-dip of the oil bearing 210/30a-4 well, and evaluate the southern fringe of the northern core area. The well was drilled to a total measured depth of 10,614 feet (3,235 meters) encountering 171 feet (52 meters) gross, 105 feet (32 meters) net of high-quality Upper Jurassic sands. Nearly 180 feet (55 meters) of core was recovered across the full reservoir section. Sterling stated that generally, the reservoir quality is very good with porosities of up to 25%, substantiated by measurements obtained while taking fluid samples. The implication of this information is that the southern fringe of the northern channel area is in communication with the central channel, being distinct from the main reservoir in the northern channel area. The operator will suspend the well for use as a potential future development well at this location or elsewhere after a sidetrack. Development options include either a subsea tie-back or FPSO development of the main northern core area with further definition of reserves and resources during the company’s next drilling campaign.

Sterling Completes Cladhan Appraisal well
Type: Status Update

May. 2011 - Sterling Resources announced that appraisal drilling in the Cladhan well 210/30a-4y has outlined the extent of the overall Cladhan play within the license. "Although the over-pressured nature of the reservoir suggests there may be remaining prospectivity up-dip from the current Central Channel well, this would likely need to be the subject of a future drilling campaign," stated the company. "This well and the previous 210/30a-4z deep well in the fan area have not impacted on the established Cladhan discovery. However, the results start to limit the upside potential on the license as a whole, and suggest that the Cladhan field is likely confined to the Northern Channel belt area and an area up-dip of the deep fan well." The 210/30a-4y well was drilled as a sidetrack into the Central Channel prospect which lies to the south of the current Cladhan discovery. The well encountered two Upper Jurassic reservoir sand sequences with a gross true vertical thickness of 191 feet (58 meters) and a net of 40 feet (12 meters) TVT. Log pressure data indicate the sands are water wet. The consortium plans to carry out an infield survey and a pipeline survey to determine how to best develop the Cladhan discovery. The Cladhan field is located on Blocks 210/29a and 210/30a in a water depth of 1,634 feet (498 meters). Serving as operator of the field is Sterling Resources, holding a 39.9% interest; EnCore holds 16.6%; Wintershall holds 33.5%; and Dyas holds the remaining 10%.

Sterling Reaches TD in Cladhan Appraisal well
Type: Appraisal Operations

May. 2011 - Sterling Resources has reached a total measure depth of 15,900 feet (4,846 meters) in its Cladhan appraisal well 210/30a-4z in the UK sector of the North Sea. The appraisal well was drilled as a sidetrack to evaluate the Upper Jurassic sands, about 1,000 feet (305 meters) deeper than the 210/30a-4 well. The well encountered two separate reservoir intervals with a gross true vertical thickness of 12 feet (4 meters) and 169 feet (52 meters). Sterling reported that although hydrocarbon shows were encountered in both reservoirs, the sandstones have an average porosity of less than 10% and it has not been possible to confirm if the sands are hydrocarbon-bearing and in pressure communication with the original Cladhan discovery. Once operations are completed at well 210/30a-4z, the Transocean Prospect semisub will drill a second sidetrack well 210/30a-4y. This well will drill into the shallower, central channel to the south. It is expected that this sidetrack will take about 25 to 30 days, subject to weather or operational delays. The operator expects to drill two more sidetracks from this well location; one to test the central channel to the south of, and up dip up of, the previous well, and then a second sidetrack location somewhere close to the current rig location. Sterling expects that both these wells will add additional understanding of hydrocarbon distribution in the Cladhan field. The Cladhan field is located on Blocks 210/29a and 210/30a in a water depth of 1,634 feet (498 meters). Serving as operator of the field is Sterling Resources, holding a 39.9% interest; EnCore holds 16.6%; Wintershall holds 33.5%; and Dyas holds the remaining 10%.

EnCore Successfully Appraises Cladhan well
Type: Appraisal Operations

Apr. 2011 - EnCore Oil said the Cladhan appraisal well has confirmed both the presence of a large oil column in the main Cladhan reservoir as well as a new hydrocarbon bearing reservoir sequence. The appraisal well was drilled as a deviated well to a total measured depth of 12,252 feet (3,734 meters), encountering oil bearing Upper Jurassic sandstones in two separate reservoir intervals. No oil water contact was observed. The well has proven a minimum hydrocarbon column of more than 1,200 feet (366 meters). Once drilling is completed at well 210/30a-4, the Transocean Prospect semisub will drill a sidetrack well 210/30a-4z to evaluate the Upper Jurassic sandstones to define oil water contacts for both the upper and lower reservoir units, as well as investigating the potential for thickening of the upper unit. The operator expects the sidetrack to take about 20 to 25 days. The Cladhan field is located on Blocks 210/29a and 210/30a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters).

Valiant Farms-Out Cladhan Stake in UK North Sea
Type: Acreage Acquisition

Mar. 2011 - Valiant Petroleum has signed a series of agreements to farm-down and swap part of its interest in two blocks in the UK sector of the North Sea. The company has entered into agreements with Sterling Resources, Wintershall and Agora Oil and Gas relating to its 100% interest in Blocks 210/29c and 210/30b which contain the Cladhan South prospect, located directly to the south and east of the existing Cladhan discovery. Under the terms of the agreement, Valiant will reduce its 100% stake in the license while Sterling, Wintershall and Agora Oil and Gas agree to pay for expenses related to drilling the site to own stakes in the Cladhan South license. Sterling Resources will become operator of the license and Valiant Petroleum will downgrade its interest to 30%. Valiant will also grab a 40% stake in Sterling-operated Blocks 21/30f and 22/26c, located in the Central North Sea. Furthermore, Sterling is seeking a rig slot for the second half of 2011 in order to drill Cladhan South as part of its exploration and appraisal program in the area. The Cladhan field is located on Blocks 210/29a and 210/30a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters).

Sterling Commences Drilling on Cladhan Appraisal well
Type: Appraisal Operations

Mar. 2011 - Sterling Resources has commenced drilling on the Cladhan discovery in the UK sector of the North Sea. The Transocean Prospect semisub is drilling appraisal well 210/30a-4 in a water depth of 1,634 feet (498 meters). Sterling will drill further down dip looking for deeper oil in the structure to the east of the previous wells, followed by a sidetrack to an undrilled channel further south of the current well penetrations. The Cladhan field is located on Blocks 210/29a and 210/30a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters). Sterling Energy, holding a 39.9% interest, operates Cladhan; Wintershall holds 33.5%; Encore holds 16.6%; and Dyas holds the remaining 10% interest.

Sterling Prepares to Spud Cladhan well in UK North Sea
Type: Status Update

Feb. 2011 - Sterling Resources plans to resume drilling in the next few days on the Cladhan discovery in the UK sector of the North Sea. The Transocean Prospect semisub, currently being towed to the site, will drill at least one well and one sidetrack. Sterling will drill further down dip looking for deeper oil in the structure to the east of the previous wells, followed by a sidetrack to an undrilled channel further south of the current well penetrations. If drilling is successful, the operator has an option to drill a second sidetrack from the same well out into the fan system. Information gathered from this drilling campaign will assist planning of the field development conceptual design, which is already under way. The Cladhan field is located on Blocks 210/29a and 210/30a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters). Sterling Energy, holding a 39.9% interest, operates Cladhan; Wintershall holds 33.5%; Encore holds 16.6%; and Dyas holds the remaining 10% interest.

Cladhan Flows at a Stable Rate
Type: Appraisal Operations

Sep. 2010 - Testing operations on the Cladhan appraisal well, 210/29a-4z, flowed at a stable rate of 5,903 bopd for more than 13 hours through a 28/64-inch choke with a final wellhead pressure of 1,874 psi. The flow rate was restricted by the capacity of surface facilities. Sterling Resources, operator of the field, has indicated that with larger 4.5-inch completion tubing, they estimate that the well can produce more than 15,000 bopd. The testing has confirmed light oil with a gravity of about 34 degree API and a gas oil ratio of 245 scf/bbl. Once testing is completed, the well will be plugged, and a sidetrack down dip southeast of the discovery well will be drilled by the J W McLean semisub to figure out the oil water contact in the field. Sidetrack operations will commence later this week, which should take about two weeks. Once the oil water contact is established, the operator can define the size of the Cladhan accumulation. The Cladhan field is located on Blocks 210/29a and 210/30a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters). Sterling Energy, holding a 39.9% interest, operates Cladhan; Wintershall holds 33.5%; Encore holds 16.6%; and Dyas holds the remaining 10% interest.

Sterling Successfully Drills Sidetrack Well on Cladhan
Type: Operator Update

Aug. 2010 - Delineation activities on the Cladhan sidetrack well were completed, announced Sterling Resources. The sidetrack well was drilled to a total depth of 11,215 feet (3,418 meters), encountering a gross hydrocarbon column of 159 feet (48 meters) with 102 feet (31 meters) of net hydrocarbon bearing sandstones. The reservoir quality is excellent with average porosities of 21% and average oil saturations of 86%; and the two wells (discovery and sidetrack) have confirmed a total hydrocarbon column in excess of 273 feet (83 meters). A drill stem test will now be performed. Sterling anticipates that results from the DST operations will confirm the commerciality of the Cladhan field. Cladhan is located on Blocks 210/29a and 210/30a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters). Sterling Energy, holding a 39.9% interest, operates Cladhan; Wintershall holds 33.5%; Encore holds 16.6%; and Dyas holds the remaining 10% interest.

J W McLean Arrives at Cladhan Location
Type: Status Update

Aug. 2010 - The J W McLean semisub has arrived at the Cladhan location and will commence operations to sidetrack and delineate the oil discovery made in December 2008. The Cladhan field is located on Blocks 210/29a and 210/30a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters). Sterling Energy, holding a 39.9% interest, operates Cladhan; Wintershall holds 33.5%; Encore holds 16.6%; and Dyas holds the remaining 10% interest.

Sterling Energy to Spud Cladhan Well
Type: Status Update

Jul. 2010 - The J W McLean semisub should commence drilling operations at the Cladhan location within the next couple of days, announced a partner on the field, EnCore. The Cladhan field is located on Blocks 210/29a and 210/30a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters). Sterling Energy, holding a 39.9% interest, operates Cladhan; Wintershall holds 33.5%; Encore holds 16.6%; and Dyas holds the remaining 10% interest.

Sterling to Delineate Cladhan Well
Type: Appraisal Operations

Jul. 2010 - The JW McLean semisub should arrive at the Cladhan field towards the end of July to drill a sidetrack into the discovery well. Delineation of the field begins with sidetracking to an up dip location in Upper Jurassic channel sands to prove a deeper oil column in the structure. The Cladhan field is located on Blocks 210/29a and 210/30a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters). Sterling operates the field, holding a 39.9% interest; Wintershall holds 33.5%; Encore holds 16.6%; and Dyas holds 10%.

Encore Confirms 2010 Drilling Plans for Cladhan, Catcher
Type: Status Update

Feb. 2010 - Appraisal drilling on the Cladhan discovery, located on Blocks 210/29a and 210/30a, will commence between late March and early July 2010 using the J W McLean semisub. The well will appraise the southward extension of the stratigraphically trapped 110-foot light oil column encountered during the discovery in November 2008. The Catcher prospect, located in the UK Central North Sea Block 28/9, will be drilled by the GSF Galaxy II jackup in late March/early April 2010. In the event of a discovery on the Catcher prospect, the operator expects to either well test or perform a sidetrack into the adjacent Catcher East Eocene Tay sand prospect. Sterling Energy operates Cladhan, and Encore operates the Catcher prospect.

Sterling to Kick Off Cladhan Appraisal Drilling in North Sea
Type: Appraisal Operations

Dec. 2009 - Appraisal drilling on the Cladhan field is expected to launch by 3Q 2010, utilizing the J W McLean semisub. In November 2008, a Cladhan discovery well encountered a stratigraphically trapped 110-foot (34-meter) light oil column, and appraisal drilling will be conducted to determine the size and scope of the discovery. Cladhan is situated on Block 210/29a in the UK sector of the North Sea in a water depth of 1,634 feet (498 meters). Sterling operates the block and holds a 39.9% interest; EnCore holds 16.6%; Wintershall holds 33.5%; and Dyas holds the remaining 10% interest.

Encore Oil Reports on Cladhan field in North Sea
Type: Operator Update

Jun. 2009 - Plans are underway for an appraisal well to be drilled on the Cladhan light oil discovery located in block 210/29a in the UK Northern North Sea. Timing of the well is still to be finalized, but it is likely that this will be Q4 2009 or Q2 2010. The initial well, drilled in November 2008, confirmed the presence of a stratigraphically trapped 110 feet (34 meters) light oil column with no apparent oil-water contact.

Sterling Unlocks Oil at UK North Sea's Bowstring East
Type: New Discovery

Nov. 2008 - Sterling has announced the successful drilling of the Cladhan well located on the Bowstring East Prospect, Block 210/29a, in the United Kingdom North Sea. Sterling holds a 39.9% interest and is the operator of the License P1064. Well 210/29a-4 has encountered an oil column in excess of 110ft (34m) with no observed oil-water contact, in an Upper Jurassic sequence below 9,450ft (MDRT) containing 25ft (8m) of sandstones with log porosity exceeding 20% and showing high oil saturations. The well will be suspended providing the group the option to re-enter, side-track, flow test, at a later date, once the data-set collected has been evaluated for potential resource size and commercial options.

Sterling Spuds Cladhan Well in UK North Sea
Type: Status Update

Oct. 2008 - Revus has reported that operations on the Cladhan exploration well on Block 210/29a in the United Kingdom Northern North Sea have commenced, with the arrival of the Transocean 704 semisubmersible rig at the site. Revus holds a 33.5% interest in the block, which is operated by Sterling Resources (39.9% interest). The other partners are Encore Petroleum Limited (16.6%) and Dyas UK Limited (10%).

Cladhan South
Non-Commercial - Apr 27, 2012 to -

Appraisal Drilling - Mar 13, 2012 to Apr 26, 2012

The well did not find hydrocarbons.

Cladhan
Under Development - Apr 2013 to -

Cladhan received UK DECC approval and will be developed as a tie back to the Tern Alpha platform.

Discovery (Appraised) - Jun 13, 2011 to Apr 2013

Appraisal Drilling - May 21, 2011 to Jun 12, 2011

Appraisal Drilling - Feb 21, 2011 to Apr 12, 2011

Appraisal Drilling - Sep 22, 2010 to Oct 12, 2010

Appraisal Drilling - Aug 05, 2010 to Sep 16, 2010

Appraisal Drilling - Jun 01, 2010 to Aug 2010

Encore has confirmed that the JW McLean semi-submersible will drill the Cladhan well to appraise the southward extension of a 110ft stratigraphic light oil trap encountered in the original discovery well drilled in November 2008.

Discovery (Drilled) - Nov 2008 to May 2010

210/29a-4 well was drilled to a total depth of 9,734 feet. Wireline logging confirmed 25 feet of net hydrocarbon pay over a gross interval of over 110 feet. Plans underway for appraisal located in block 210/29a.

Exploratory Drilling - Oct 2008 to Nov 2008

T.O.'s Sedco 704 drilled 210/29a-4

Update History
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market. The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
UPDATE TYPE DATE DAYS AGO
Field Updated Apr 21, 2014 251
Field Updated Dec 19, 2013 374
Activity Added Dec 19, 2013 374
Field Updated Sep 12, 2013 472
Activity Added Sep 12, 2013 472
Field Updated Sep 11, 2013 473
Field Updated Apr 25, 2013 612
Field Status Updated Apr 25, 2013 612
Field Status Added Apr 25, 2013 612
Project Description Updated Apr 25, 2013 612
Activity Added Apr 25, 2013 612
Field Updated Mar 07, 2013 661
Activity Added Mar 07, 2013 661
Field Status Updated Apr 20, 2012 982
Field Updated Apr 20, 2012 982
Activity Added Apr 20, 2012 982
Project Description Updated Apr 20, 2012 982
Field Added Apr 20, 2012 982
Field Status Added Apr 20, 2012 982
Field Status Added Apr 12, 2012 990
Activity Added Apr 12, 2012 990
Activity Added Mar 20, 2012 1013
Field Updated Mar 20, 2012 1013
Field Status Updated Mar 20, 2012 1013
Field Status Added Mar 20, 2012 1013
Project Description Updated Mar 20, 2012 1013
Field Updated Mar 19, 2012 1014
Activity Added Mar 15, 2012 1018
Field Updated Feb 28, 2012 1034
Activity Added Feb 21, 2012 1041
Activity Added Jan 10, 2012 1083
Field Updated Jan 10, 2012 1083
Activity Added Jun 03, 2011 1304
Field Updated Jun 03, 2011 1304
Field Updated May 18, 2011 1320
Field Status Added May 18, 2011 1320
Activity Added May 18, 2011 1320
Field Updated May 11, 2011 1327
Activity Added May 11, 2011 1327
Activity Added Apr 12, 2011 1356
Field Updated Apr 12, 2011 1356
Project Description Updated Mar 15, 2011 1384
Activity Added Mar 08, 2011 1391
Project Description Updated Mar 08, 2011 1391
Field Updated Mar 08, 2011 1391
Activity Added Mar 01, 2011 1398
Field Status Updated Mar 01, 2011 1398
Field Updated Mar 01, 2011 1398
Project Description Updated Mar 01, 2011 1398
Field Updated Feb 17, 2011 1410
Field Status Updated Feb 17, 2011 1410
Activity Added Feb 17, 2011 1410
Project Description Updated Dec 12, 2010 1477
Activity Added Sep 13, 2010 1567
Field Updated Sep 13, 2010 1567
Field Status Updated Sep 13, 2010 1567
Field Status Added Sep 13, 2010 1567
Field Updated Aug 30, 2010 1581
Activity Added Aug 30, 2010 1581
Field Updated Aug 06, 2010 1605
Activity Added Aug 06, 2010 1605
Activity Added Jul 30, 2010 1612
Field Updated Jul 21, 2010 1621
Activity Added Jul 21, 2010 1621
Field Status Updated Jun 01, 2010 1671
Field Status Updated May 10, 2010 1693
Project Description Added Feb 11, 2010 1781
Field Updated Feb 09, 2010 1783
Field Status Updated Feb 09, 2010 1783
Field Status Added Feb 09, 2010 1783
Activity Added Feb 08, 2010 1784
Field Updated Dec 22, 2009 1832
Activity Added Dec 21, 2009 1833
Field Status Updated Sep 04, 2009 1941
Field Updated Sep 04, 2009 1941
Field Updated Jun 30, 2009 2007
Activity Added Jun 25, 2009 2012
Field Updated Jun 25, 2009 2012
Field Status Added Jun 25, 2009 2012
Field Status Updated Jun 25, 2009 2012
Field Status Updated Jun 12, 2009 2025
Field Status Added Jun 12, 2009 2025
Field Updated Jun 12, 2009 2025
Activity Added Nov 17, 2008 2232
Field Updated Nov 17, 2008 2232
Activity Added Oct 14, 2008 2266
Field Added Sep 19, 2008 2291

    Project Update History Search - View all the lastest updates made by the SubseaIQ team.
 
 
 
Field Name Cladhan
Discovery Date Nov 2008
Block P1064, 210/29a, 210/30a
Reserve Type Oil
Current Status Under Development
Production Start
Water Depth 498 m / 1,643 ft
Field Name Cladhan South
Discovery Date
Block 210/29c and 210/30b
Reserve Type n/a
Current Status Non-Commercial
Production Start
Water Depth n/a